The terrestrial station of BUTE was tested on 29 March. The connection was actually set up by dr. András Gschwindt project manager and Gábor Marosy system engineer in the Radio Club of BUTE. A trial transmission was performed early afternoon with Levente Dudás, operating the backup station of Masat-...
The second space flight of Charles Simonyi, for which we are also preparing, is already in the doorway. We have been testing and preparing the satellite receive station of BUTE for a while to be able to reliably receive the transmissions when Simonyi establishes radio connection with several Hungari...
The printed circuits boards are being designed this week and in the coming ones, where thermal aspects must also be taken into consideration besides the production constraints stipulated by the manufacturer. The vacuum does not contain any ambient air or any kind of gas in sufficient density that ma...
During the weekend there was a TV interview and some newspaper articles appeared in the media. These can be found in the Media appearances page. If there is anything you want to share with us, please let us know what you think....
The time has come when the precise, detailed and hopefully sufficiently comprehensive design work of the past months manifests in physical devices. The interfaces (mechanical, electronic, data, etc.) between the subunits can mainly be considered as ready. The development versions of the system units...